Work commenced on Monday 27th June 2016 to refurbish an existing playground situated at Clawdd Poncen, Corwen. The team were asked to break out and remove most of the playground equipment, provide 193 sqm of new base works and edgings along with re-dressing the site in preparation for the wet pour contractors. New equipment was assembled and installed in different locations across the park and surrounded by bow top fencing for added security. Children will benefit from a new 3m Cone Climber, 2.4m high basket swing, Dragonfly Seesaw and much more!